TERMITE CONTROL SERVICES

Termite Control Services

Preventing termite infestation with the help of termite control services in Kolkata and other places should be given top priority by the homeowners. When left untreated for a long period of time, termite infestation could cause substantial harm to the home. These tiny insects are considered to be the biggest contributors in the destruction of your home and property.

Areas where termites can be found

Wooden furniture and exterior foundations are considered to be the common locations where termites build their colonies. Apart from there, these tiny silent destroyers can be found in the following areas:

  • Staircases
    • Solid wood kitchen cabinets
    • Attics
    • Crawlspaces
    • Sheds
    • Subflooring
    • Flooring
    • Hardwood
    • Workshops
    • Garages

Termite Treatment Services Policy

To stop and prevent the movement of termites from the ground, holes are drilled from inside your premises at the junction of the wall and the floor or just above the skirting (depending on the flooring) at an angle of 45 degrees. The holes are drilled along the side of the entire outer wall at approximately 30cm (12″) intervals. The insecticide is then poured into these holes to soak the masonry. If your premises are on the ground floor, the partition walls are also treated. The drilling operation is not carried out on the partition walls above the ground floor because the RCC slabs act as a mechanical barrier and the termites cannot penetrate them. It takes about 2-3 hours to treat a flat of about 750 Sq. Ft.

AMC CHECK UP VISITS
After the initial major treatment, our operator will visit your premises for a check up every quarter. Necessary treatment will be carried out in case of any re-infestation. You can call us whenever there is a reappearance of termites during the contract period.

Enter into a 5-year’s comprehensive anti-termite contract with Pecopp for your entire building and avail of a five year warranty against termites.

When you enter into a five year contract for your entire building our method of treatment which is based on the ISI specifications, consists of chemical treatment of the following areas:

  1. The soil around the foundation of your building (External Treatment).
  2. The base of the masonry walls (Internal Treatment).
  3. All vulnerable wooden portions of the building.
  4. Soil (External Treatment)
    A chemical barrier is created between the termites in the soil and the building that has to be protected. This is achieved in the following manner: If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 30 cm (12″) apart from each other. Insecticide is then poured, so that it reaches the soil and creates a chemical barrier to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
  5. The Base of The Masonry Walls (Internal Treatment)
    The internal treatment of base of masonry walls and treatment of woodwork is carried out as per the one-year maintenance contract. Termites, which originate from the soil are controlled effectively when your building is treated at the ground level as per the above mentioned method.
  6. Vulnerable Wooden Portions of the Building
    Further, on all floors, wood work like doors and windows, which are highly susceptible to termite attack are also protected by treating them with the drilling operation. Spot treatment of spraying on infested areas in the walls and ceiling is also carried out.

Warranty: 5 Years

Warranty
In case of comprehensive anti-termite treatment of the entire building, we give a warranty of five years. Any re-infestation of termites during the warranty period is treated without any extra charge.

Frequency of Check Ups

  1. After the initial treatment, a check up of the entire building is carried out every quarter for the first year.
  2. A check up is carried out once every six months for the 2nd year.
  3. After two years there will be an annual visit till the end of the contract period.

The check up visit is to find out whether there has been any re-infestation of termites. Necessary treatment will be carried out in case of re-infestation. You can call us as and when there is re-infestation during the entire contract period of five years.

 

PRECONSTRUCTION ANTI TERMITE TREATMENT

We can protect your building or house from termites before construction by doing anti termite treatment at construction stage. This is the stage when the treatment is most effective. After the building is complete and the tiles fitted, it is difficult to carry out the treatment and it is not as effective. We give 10 years guarantee. We recommend Anti Termite Pre Construction treatment as perBIS standard 6313 Part II – Revised in December 2013.The treatment starts from half meter below the ground level. No treatment is required below this level. The cost is insignificant compared to the total cost of land and building. But it will be a significant additional selling point, for selling the space in your building. Your pest control done by Pecopp means you care for your customers even after giving possession.

METHOD

Stage 1: Treatment of top surface on plinth filling (Under Slab)

Before laying the slab on the floor the top of the consolidated earth should be treated with termiticide @5L/sq.m. The treated soil must not be disturbed between the time of application and laying of slab on the floor. If the filled earth has been well rammed and the surface does not allow the termiticide solution to seep through, holes upto 5-7.5 cm deep & 12 mm diameter at 15cm intervals to be made for facilitating saturation of the soil with the chemical.

Stage 2: External Perimeter

The soil in contact with the internal wall of the building should be treated with termiticide ready solution @ 7.5 L/sq.m of the vertical surface of the sub structure to the depth of 30cm. a shallow channel can be excavated along and close to the wall and rodding with 12mm diameter mild steel rods at 15 cm interval to a depth of 30 cm can be done for uniform dispersal of the chemical.

Stage 3: Treatment of top surface on plinth filling (Under Slab)

If the refill earth was not treated, the earth along the external perimeter of the building after completion should be rodded at 15cm interval to a depth of 30 cm to expose the foundation wall surface. Termiticide ready solution should be poured along the wall @ 7.5 L/sq.m of the vertical surface and the earth tamped back into place.

  1. Backfill with immediate contact with RCC foundation
  2. Juction of wall n floor
  3. Top serface of plinth feeling
  4. External perimeter of building

Make a Pestless Residance